Cable & Wire

Factory Direct Sale Heating Cable Underfloor Heating Foil

Jiangyin Senphus Electrical Material Co., Ltd.
  • Type:Insulated
  • Conductor Type:Solid
  • Application:Heating, Underground
  • Conductor Material:Copper
  • Sheath Material:PVC
  • Insulation Material:Teflon

Base Info

  • Model NO.:SHHM
  • Material Shape:Round Wire
  • Range of Application:Underfloor Heating
  • Certification:ISO9001, CE
  • Brand:Senphus
  • Heating Mat Power:160W,M2 or Customize
  • Heating Mat Voltage:110V~230V
  • Heating Mat Width:0.5m
  • Heating Mat Length:1~24m
  • Heating Mat Model:1~12m2
  • Heating Mat Color:Red, White, Yellow, Green
  • Heating Mat Cable:Twin Conductor
  • Heating Mat Certificate:CE SAA
  • Transport Package:Carton, Pallet, Wooden Box, Color Box
  • Specification:CE UL SAA
  • Trademark:SENPHUS
  • Origin:Jiangsu China
  • HS Code:8516800000
  • Production Capacity:3000,Month

Description


Type
voltage
Rated power
Resistance                      @20oC+10/-5%
Mat size
Length
V
W
Ω
m
m
SHHM-160-0.5M2
220
80
605
0.5X1.0
5.55
SHHM-160-1.0M2
220
160
302.5
0.5X2.0
11.1
SHHM-160-1.5M2
220
240
201.7
0.5X3.0
16.65
SHHM-160-2.0M2
220
320
151.3
0.5X4.0
22.2
SHHM-160-2.5M2
220
400
121.0
0.5X5.0
27.75
SHHM-160-3.0M2
220
480
100.8
0.5X6.0
33.3
SHHM-160-3.5M2
220
560
86.4
0.5X7.0
38.85
SHHM-160-4.0M2
220
640
75.6
0.5X8.0
44.4
SHHM-160-4.5M2
220
720
67.2
0.5X9.0
49.95
SHHM-160-5.0M2
220
800
60.5
0.5X10.0
55.5
SHHM-160-6.0M2
220
960
50.4
0.5X12.0
66.6
SHHM-160-7.0M2
220
1120
43.2
0.5X14.0
77.7
SHHM-160-8.0M2
220
1280
37.8
0.5X16.0
88.8
SHHM-160-9.0M2
220
1440
33.6
0.5X18.0
99.9
SHHM-160-10M2
220
1600
30.3
0.5X20.0
111
SHHM-160-12M2
220
1920
25.2
0.5X24.0
133.2






 
Remarks: It can be changed according to customers' requirements.
 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Factory direct sale heating cable underfloor heating foil Installation
1) Don't damage heat mat. 
2) Well installation can guarantee the efficiency.
3) After the installation, take a full test and make sure the system works well.
 4) Heat insulation materials should be dry and the joint of cable should be sealed.
5)The junction box should be sealed to prevent water leak.
6) Protective sleeve must not be damaged during installation, and the core wire can not bare.